Fire, flooding, power outage, hardware failure, ransomware, a cloud service outage, accidentally deleted data... The list of events that can stop a business's information systems is long. You cannot prevent them all, but if you know in advance what to do when they happen, you limit damage seriously. A disaster recovery (DR) plan does exactly this.
Backup and disaster recovery are not the same
- Backup: Taking and keeping a copy of data. See backup strategy.
- Disaster recovery: Planning all the steps needed to bring the system and work back to life from backup: who, when, in what order, on what infrastructure, with what data?
- Business continuity (BCP): The wider frame; it covers staff, premises, suppliers and communication beyond IT.
Having a backup does not mean you can bring the system up quickly. Many businesses hit problems because they try restoring for the first time in a real crisis.
Two core targets: RTO and RPO
- RTO (Recovery Time Objective): After a system goes down, how soon at the latest must it run again? For example, 1 hour for the till system, 4 hours for email, 2 days for the archive system.
- RPO (Recovery Point Objective): How much data loss can you tolerate at most? If RPO is 1 hour, the last backup must be at most 1 hour old.
These targets are a business decision, not a technical one: What does an hour of downtime cost? What does a day of data loss mean? Lower RTO and RPO require more expensive infrastructure and operations; setting the same target for every system creates needless cost.
Preparing the plan step by step
1. Critical system and dependency inventory
Which systems stop the business? Examples: POS or till, reservation system, ERP, accounting, email, website, payment infrastructure, phone system, network and internet, identity system. Map how systems depend on each other: if the identity system fails, which are affected? See ERP, cloud phone systems and the office network guide.
2. Business impact analysis
For each system, determine downtime cost (lost revenue, reputation, legal consequences) and the longest acceptable downtime. This leads to prioritisation: which comes back first?
3. Set RTO and RPO
Set targets per system and write them in a table. Targets should be realistic and fit the budget.
4. Identify threat scenarios
- Hardware failure or disk loss,
- Fire, flood or loss of access to the building,
- Ransomware and cyber attack; see the ransomware guide and the incident response plan,
- Outage at the cloud provider or internet line,
- User error or accidental deletion,
- Unavailability of key staff.
5. Choose a recovery strategy
Options by your targets and budget:
- Restore from backup: Most economical; RTO and RPO relatively long.
- Cold or warm standby environment: An alternative environment is kept ready and switched on when needed.
- Hot standby or high availability: The second environment is always current; downtime is very short. Expensive, to be considered only for critical systems.
- Cloud-based recovery: Bringing up the virtual environment in the cloud during a disaster. For cost optimisation the cloud cost optimisation article and, for migration, the cloud migration checklist may be relevant.
- Using SaaS: The provider takes on continuity responsibility; still check the contract and the export-ability of your data; see SaaS or on-premises?.
6. Align with backup design
The 3-2-1 rule (3 copies, 2 different media, 1 off site), immutable or offline backups and regular restore tests are the foundation of the DR plan. Because ransomware can target your backups too, protect access to backups with separate credentials and MFA.
7. Roles and communication plan
- Incident lead, technical team, decision-makers, communications lead: Names and deputies.
- Phone list: Email may not work; a contact list accessible offline (printed or on the phone).
- Supplier contacts: Internet provider, software support, cloud provider, hardware service.
- Customer and employee communication: What will be said during the outage and where announced?
- Legal notification: Processes if personal data is affected; see the KVKK compliance checklist.
8. Write recovery procedures
For each critical system, step-by-step instructions anyone can follow without relying on memory: backup location, restore commands, verification checks, order dependencies, where credentials are kept in a secure vault (see the password manager article). Also keep a record of DNS, domain and email settings; see the domain and DNS guide.
9. Alternative ways of working
How does work continue with the system down? In a restaurant, manual orders and cash or a backup POS; in a hotel, a printed reservation list and key procedure; in a shop, offline sales mode. This "paper plan" is sometimes the most valuable part. See choosing a restaurant POS, the channel manager guide and POS security.
10. Test and update
An untested plan is not a plan. Three kinds of test:
- Tabletop exercise: Talking through a scenario with the team.
- Restore test: Restoring a chosen system from backup into a test environment and measuring RTO and RPO.
- Full outage simulation: Planned and controlled; because it is risky, at non-critical times.
Work gaps found in tests into the plans. Update the plan at least yearly and after major system changes. Inform staff for basic awareness; see security awareness training.
Who needs how much?
- Small business: A critical system list, regular tested backups, a contact list and a 1–2 page procedure are often a good start.
- Mid-sized business: RTO and RPO per system, an alternative environment, regular tests, written roles.
- Business providing critical services: High availability, a backup environment in a separate location, continuous monitoring.
If you have no IT team, managed IT support can help prepare and test the plan. To strengthen security, see cyber security basics, zero trust and endpoint security.
Common mistakes
- Treating having a backup as disaster recovery,
- Never testing a restore,
- Keeping backups on the same network or account, open to ransomware,
- Not setting RTO and RPO targets,
- Keeping credentials only in the system that is down,
- Forgetting the communication plan (depending on email),
- Writing the plan and never updating it,
- Skipping dependencies (identity, DNS, network),
- Not checking suppliers' continuity commitments.
A starter plan (in two weeks)
- List the 5 most critical systems.
- Write an RTO and RPO target for each.
- Check where the backups are and when a restore was last tried.
- Create a contact list and role allocation.
- Write and test step-by-step recovery instructions for the most critical system.
- Set investment priorities based on findings.